1.Geological mapping |
About 10,000 sq.km in Pakistan, detailed as under:
Balochistan
4,920 sq.km
Punjab 1,280 sq.km.
Sindh 1,280 sq.km.
NWFP 1,280 sq.km.
AJK 640 sq.km.
Northern Areas 640 sq.km.
|
8,210 sq.km.
area has been mapped/updated in different parts of the country.
The detail of which is as under:-
Balochistan:
2,880 sq.km. area in Loralai, Mastung and Kalat districts.
AJK: 3,300 sq.km. area in Sudhuoli, Muzaffarabad, Kotli,
Bagh and Rawlakot districts.
Northern
Areas:
400 sq.km. area in Dassu District.
Punjab: 640 sq.km. area in Okara District.
Sindh: 640 sq.km. area in Dadu District.
NWFP: 350 sq. km. area in Dir and Swat districts.
Geological
map of bentonite-bearing zone in Dudial area, Mirpur District, AJK
has been prepared.
|
AJK
= 463,117 Islamabad=1,674,486 Peshawar =1,035,704
Quetta = 4,572,907
Lahore = 1,461,408
Karachi = 1,409,365
Total =10,886,987
The above amount
excludes establishment charges and expenses on utilities.
|
Rs.244.399
million |
| 2.Geophysical
mapping |
4,000
sq.km. in Punjab and Balochistan |
Final report
on geophyscial investigation for sulphide mineralization in Reshian,
Lamnian and Treri areas, AJK has been submitted to AKMIDC. Geophysical
investigations are continued in L-2 & L-3 areas of Quetta valley
for groundwater. Gravity and magnetic surveys have been carried
out in Jhelum, Gujrat and Sialkot areas to reconfirm some observation
points.
Detailed geophysical
survey (gravity & magnetic) has been done in Makki Dhoro area, Kalat
District, Balochistan for sulphide mineralization.
Report on Gujrat-Jhelum
has been submitted for publication.
|
|
|
| Development
Systematic Evaluation and Appraisal of Coal Resources of Four Specific
Tracts in Thar Coalfield, Mithi District, Sindh |
Drilling
of 9 bore holes (2,700metres) in Block- IV Geotechnical Studies. Geological
and geophysical logging. Chemical analyses Preparation of maps and
report. |
Drilling
of 9 holes has been completed to a cumulative depth of 2,427 metres.
Geotechnical studies, geological and geophysical logging of 9 bore
holes have been completed. 249 coal samples have been collected from
drill core for chemical analysis.Compilation work of the data collected
during 1999-2000 is in progress. Chemical analyses of 162 coal samples
for 3,290 estimations have been carried out. Compilation of maps and
report are in progress. |
Rs.35.700
million |
Rs.100.000
million
|